BACKGROUND

1878  Electricity is used in Kimberly.  There is little understanding of the dangers.  Within a few years several towns in SA install generators.  There are no electrical regulations, resulting in many accidents and fires.

1939  Due to the increase of electrical installation been installed in many SA cities the number of accidents and electrocutions increased dramatically.

The government reacts by promulgating the ELECTRICAL WIREMAN and CONTRACTORS ACT.

This act requires every person doing electrical installations to undergo tests and training as an interim arrangement. New incumbents had to enter into a five year apprenticeship and to work under the constant supervision of a “qualified electrician” known as an “Electrical Wireman” for five years.

The electrical contractor, i.e. the business owner, also had to be an Electrical Wireman and had to go annually and in person to register his business with every the Local Authority in whose jurisdiction he worked. Each Local Authority had their own by-laws therefore every installation differed in every region, town and city. This was very costly for everyone.

The contractor also had to go in person to register every installation regardless of size or complexity with the Local Authority before it was commenced with.  He then had to make an appointment for inspection with the Local Inspector to pass the installation before it could be connected to the supply.  Each Local Inspector interpreted the by-laws differently and many of them assumed an importance which surpassed their position or authority and often solicited favors to pass the installation. This situation worsened in time and cost the country millions.

It was a statutory requirement that Local Authorities had to inspect 100% of all installations. This may have been possible in 1939, but by the 1970’s it had become impossible for every installation to be inspected.  This resulted in the contractors registering only those installations that needed a new supply.

1975/6 Wiehan Commission.  About 1975/6 the government establishes the Wiehan commission, the purpose of which is to undertake a study of the Labour Relations Act. This results in the repeal of the Electrical Wireman and Contractors Act.  The functions of the board are transferred to “Department of Manpower”.  Unfortunately, the system does not improve.

1979/80.  The chief inspector calls a meeting of the electrical industry. The purpose he says is to stop the abuse of power and exploitation of users and others by electrical inspectors and to seek a way forward for the industry.  He appoints a delegation made up of the Department of Labour (DoL), South African Bureau of Standards (SABS), Association of Municipal Electricity Utilities (AMEU), ESKOM and the Electrical Contractors Association (ECA), and the delegation visits seven countries. The chief inspector enters into numerous discussions with all role players. The proposal is made by the Chief Inspector to allow the removal of the power from the Local Authorities and the establishment of a work group to come up with a proposal to achieve this end.

In 1982/3 a survey was undertaken as to determine as to how many installations were in fact tested and inspected, this showed that the figure was only 12%. This highlighted the abuse of power and also the ineffective processes in place.

1983 – Establishing the ECB

The Chief Inspector requests industry to establish a board based on the principals of the National Inspection Council as seen in the UK.  It must be a body “not for gain” and it must allow membership of all “stake holder organisations” at  no cost to them. They in turn must agree to serve for free.  A board was established and named the “ELECTRICAL CONTRACTING BOARD of SA”

The Functions of the Board were: 

  1. To establish a national umbrella association that would act as a customer champion and allow the membership of different organisations to participate with criteria acceptable to all that would benefit all “stake holders” but that would not interfere other than to ensure fair play.
  2. To establish “SECTOR BOARDS” to permit different sectors of industry to  participate in the affairs of the industry in its broadest sense while ensuring fair play.
  3. To make rules to ensure that all stake holders would benefit to improve their understanding of the industry and that of the consumer.
  4. To participate on various bodies such as the AMEU, SABS, DOL, DOE. Universities, Financial institutions, SAIEE, etc.
  5. To establish an Electrical Contractor Management (ECM) diploma, partnering with Witwatersrand University, design to teach successful and competent administration of an electrical contracting company to benefit the industry in both administrative affairs and technical proficiency. Unfortunately, this program was scrapped with the launch of the Sector & Education & Training Authorities (SETA’s) and a similar program was never again released.

Many parties were involved in the establishment of the ECB and it became a strong and worthwhile organisation through assisting and mediating between many parts of industry and public alike. View our board membership here >>

 1992 – NEW ROLES ADDED

The ECB was written in to the Occupational Health and Safety Act, by government and tasked with the statutory function of what would be considered a Professional Body today:

  1. Contractor/registered party registration at no cost to the government. 
  2. To design and manage a document against which an electrical installation shall be measured for safety.
  3. To implement training programs to educate all stake holders in the new regulations, responsibilities and requirements of electrical contractors, registered persons, manufacturers, suppliers of materials, property owners and others.
  4. To consider a method of policing for the future.
  5. The ECB assigned the administration of registering registered persons to the Electrical Contractors Association (ECA)) via their seven offices around the country. It is easy to get confused between the ECA and ECB but it is quite straight forward – The ECA is an EMPLOYERS BODY and represents the interests of electricians. The ECB represents the interests of the entire industry and acts as the umbrella body and customer champion of the industry. Both bodies are needed, as are many others.
  6. In 1993, the board increased traceable registered contractor numbers from 3500 in 1991/2 to 7000 by January 1994. This number grew to nearly 11,000 in 2008.
  7. In 2003 an Identity Card was released for electricians to carry with them to verify their competence and qualifications.
  8. In 2010 the ECB launched the first online Certificate of Compliance and e-registration process, updating the manual registration to an electronic process that did not require travelling or unnecessary time for the contractor/registered person.

1994 – The First Yellow Certificate of Compliance (COC)

In 1994 the Electrical Conformance Board introduced the 1st COC printed in its present yellow form. This CoC was designed by the ECB Technical Director who was also President of the Electrical Contractors Association – Tony “Mac” McDonald. Tony is still with us today and has been constantly involved in updating and improving the Certificates of Compliance and Test Reports. Tony won the ECA Excellence Award in 2014 for his contracting company and is also a Life Time Member of the ECA and ECB.

 1998/9 – A Change in LAW BUT NO CHANGE IN DIRECTION

1998/9 – Around the turn of the millennium the Department of Labour decided to establish Approved Inspection Authorities (AIA’s). To do this they must change the Occupational Health & Safety Act and removed the ELECTRICAL CONTRACTING BOARD from the regulations and replace it with the Department of Labour. This made the functions of registration with the ECB uncertain but it opened the way for voluntary registrations.

2009 – Revised regulations are promulgated and the ECB is finally removed from the Occupational Health & Safety Act. The ECB are informed they will continue with the responsibility of registering contractors and registered persons. Conversation with the Chief Inspector continued to discuss best ways forward.

2009 – the ECB gives notice to the ECA of their plans to undertake administration electronically. The ECA would continue with the manual registrations and sale of CoC’s as service providers. Work commenced building the electronic infrastructure.

2010 – The ECB  joined the modern world by upgrading the registration method from a manual to an online electronic system. This offered the contractor the opportunity of doing their own registration, or obtaining their own CoC from any location, from their personal computer in their office, home, or even using the nearest Post Net.

2010 – The ECB informed the DoL of the electronic improvement and the intention to do likewise with the CoC / TEST REPORT. The new eCoC system was then launched later in 2010.

2010 – ECB meetnig with the Chief Inspector highlighted his concerns that the current registration systems were still not sufficiently accessible to all. The ECB agreed to see what could be done. The ECB were again re-appointment for registrations.

2010 – ECB discussions continued with the Chief Inspector where the possibility of appointing municipalities or wholesalers for registrations would offer a much greater presence throughout the country as service providers, none of which does the Chief Inspector object to. The ECB starts looking for an additional partner to make CoC and registration  more accessible to the contractor. Several were contacted and expressed interest, others not.

2011 – ECA notifies the ECB that due to the cost of undertaking contractor registration and the uncertainty of the DoL  appointment of the ECB, they were no longer prepared to be the ECB service providers as of the 31 Sept 2011. 

2011 – Negotiations between ECB and VOLTEX are concluded. VOLTEX agree to be ECB’s new  service provider, offering a high degree of convenience and service, increasing the number of registration points from 7 to about 50. This added to the online registration and eCoC certificates giving a much greater access to all.

26th May 2012 – Dept of Labour notified the ECB of their intent to take over electrician registration, contractor registration & CoC issuance from 1st September 2012. Between June and July, various meetings occurred and letters passed between the department the ECB due to concerns that there is no infrastructure in place to support this work. The ECB also offered the department their online registration system at no cost to themselves. This was all turned down.

15th August 2012 – The Department of Labour notifies the ECB of their intention to take over services on the 1st September, despite having no central database or logging system in place for electricians, contractors or CoCs.

1st Sept 2012 – The Department of Labour takes over control of registrations.

Q4 2012 – The South African Qualifications Authority (SAQA) announces the launch of the Professional Body and encourages all industry organisations who perform this role unofficially to apply. The newly launched Professional Body status is designed to ensure industry organisations correctly register & verify qualifications of persons and companies in the industry on behalf of the government. Included is the monitoring of yearly continual training & development with Certified Professional Develop points.This also includes Recognition of Prior Learning, for those working in the industry for years without qualifications. Unfortunately, the electrical installation sector of South Africa still does not have a Professional Body.

13th April 2013 – The Chief Inspector and Department of Labour confirm that any electrician can create and issue their own Certificate of Compliance. Unfortunately, by preventing a central record of the issuance of these documents now means that electrical work performed in the country can not longer be easily traced to a responsible electrician and contractor.

As the ECB was originally established to represent the interests of the industry and be a customer champion it simply continued on in that role raising funds through listings, training and sponsorships from industry and electrical installers. We are very grateful for those who believe in what we do.

 

2010 – Growing the Umbrella

In 2010, the electrical manufacturing and supply industry established ERIC, a body to counter the flood of cheap imported products entering the country. Many of the ERIC board members served on the ECB board and used the same administration staff. As a result of the change to the ECB’s function over the years, and loss of statutory contractor registration in 2012, it was proposed in 2014, to rebrand and combine the functions of ECB and ERIC, under the acronym ECB as it is a well known brand name, but to change the name to the “ELECTRICAL CONFORMANCE BOARD” (ECB), as it now included the functions previously under taken by ERIC.

The revised ECB constitution permits all conforming entities e.g electrical manufacturers, importers, wholesalers, distributors, designers, installers, and others who agree to the conditions of membership, which includes distributing, designing and installation of products conforming to the relevant regulations and standards when and where required, to become “LISTED / CONFORMING MEMBERS” and to use the ECB logo and motto, “SAFETY THROUGH CONFORMANCE”, on all correspondence / marketing material.

The regulations contained in the “OCCUPATIONAL HEALTH and SAFETY ACT” (Act 85 of 1993) are explicit in that they state that all electrical equipment, manufactured, imported, advertised for sale or sold and intended to be installed in an electrical installation, shall comply to the standards. As mentioned previously the ECB includes all stakeholders in its broadest sense as members. The purpose is not only to make electricity safer for all, but to assist in leveling the playing fields by applying the statutory regulations and making them work for all and consequently benefiting all genuine South African and foreign manufacturers and importers. This task can’t be done alone. It must be a joint venture between “GOVERNMENT and the PRIVATE SECTOR”.

The ECB is in an ideal position to undertake this task as when it talks to the regulator, it does so on behalf of all ECB stake holders and with the backing of the consumer. Therefore fingers cannot be pointed at any one company or individual.

 

2019 – Functions OF THE ELECTRICAL CONFORMANCE BOARD

  • The ECB handles more than 10,000 call cases per annum.  These come from all quarters. If they can be answered on the phone by staff members, at no cost to our listed member and the general public. We assist in technical as well as standard complaint issues.
  • The ECB represents the customer interests at the South African Bureau of Standards (SABS) main committees and working group meetings.  It is at these forums that standards and codes are discussed and created.  Currently we serve on ± 20 different workgroup committees meeting several times per year. The decisions of these committees affect all stake holders as most of these standards are normatively referenced in the SANS 10142-1 / 2 Code of Practice or are a requirement of the OHS Act.
  • Our Technical Director, Tony McDonald, has represented the electrical installation industry since 1972 at SABS and since 1980 as an SA delegate to the International Electrotechnical Commission (IEC).
  • Photovoltaic SSEG – SANS Standard – In 2010 the ECB saw the need for safety regulation and control in respect of photovoltaic (solar) and other renewable energy sources and was the body that took over the organisation of the code development regarding renewable energy installations and standards development. The ECB identified the urgent need for the establishment of such a workgroup and campaigned for the re-establishment of the failed SABS committee and was successful in this regard by approaching the CSIR, who managed to obtain US Aid support to fund this initiative in 2015. The ECB is still the secretariat of this committee and as a result a draft standard has been created and is in final stages of release.
  • The SABS 10142-1 committee is the main committee that checks the correctness of the standard writing before it is adopted and included in the SABS 10142 family of standards and becomes a statutory standard. The ECB is not compensated for this or any of the other committees on which it serves.
  • The ECB was the organisation appointed to do the statutory function on  behalf of the SA public at no cost to Government and with no subsidy from government. We still attempt to perform part of this role today. As the ECB’s main income was derived from electrical contractor registration and sale of CoC’s it was in a position to offer a free service to all.
  • Without the ECB, there will be no one to contact to represent the consumer’s interests and to support the over-arching needs of the industry. This leaves the electrical sector fragmented and in danger of miscommunication between all of the many industries the electrical sector services.

2019 – The State of the Electrical Sector

The SA Fire Protection Association tells us that 35% of all fires have an electrical origin.

The South African Insurance Association informs us that in 2018 fire damage amounted to R3bn per annum. This figure was only  R1bn in 2009. What is the cause? 

There is a belief between us all that it is due to poor workmanship, non-compliant materials available on the SA market due to the lack of policing.  Incorrect choice of materials, lack of understanding that electrical installations have to be correctly designed and therefore the installers have to be correctly educated and trained  in the design of electrical installations. Research is currently being performed to clarify this.

The ECB is still the only organisation in the country fighting to ensure clarity, safety and inter-communication between all industry sectors. We do this with volunteers, little income and support. We appreciate all of those who contribute and donate to the ECB. As electrical products and technology penetration increases in the country we hope more and more people will stand behind us to try and ensure the South African public remain safe.

 

THANK YOU

We appreciate all that the industry does for us. We appreciate all of the electrical installers and sponsors who support us. The vast amount of work performed by the Directors and associates of the ECB is still voluntary and we are constantly searching for greater support.

We are determined to ensure the industry strives for greater transparency and greater safety.  We believe that without this vision standards will continue to decrease. We urge you to ensure that your electricians are ECB listed. We perform checks to ensure their are qualified and registered. We also encourage you to ensure you receive ECB Certificates of Compliance and Test Reports for all electrical work performed on your properties. The numbered forms are traceable to our electricians who ensure all work performed is of the correct standard.

 

If in doubt then Find a locally listed ECB Electrician near you:

            FIND AN ELECTRICIAN NEAR YOU >>